Engineering and Construction
Engineering and Construction Administration is responsible for various support services, including:
- Development, management and submittal of the department's operating and capital budgets
- Flood maps
- Manages the Professional Services Selection Committee (PSSC)
- Designs County infrastructure
- Administers prequalification and selection of engineers and contractors
- Administers construction contract bidding, processing and inspection for:
- Alleys
- Bridges
- City and County project coordination
- Dredging and parks
- Property surveys
- Public roads
- Sewers
- Shoreline protection
- Storm drains
- Water lines
PUBLIC NOTICES
Periodically, the Department of Public Works and Transportation needs to advertise specific information on upcoming work or applications to perform specific tasks through a public notice. The following are current public notices:
- Patapsco Sewershed Basin 33 Relief Sewer
- Delmar Sewershed Sanitary Sewer Rehabilitation
BASIC SERVICES MAPS
In accordance with Subsection 4A02.3E of the Baltimore County Zoning Regulations, annual updates to maps of areas within Baltimore County that are deficient with respect to Public Water Service, Public Sewer Service and Transportation are required. Building permits may be withheld or deferred in areas designated as deficient on these maps:
- Engineering Report—Sewer and Water
- Basic Services Map—Sewerage
- Basic Services Map—Water Supply
- Traffic Report
- Basic Services Map—Transportation
Refer to Bill 17-24 for revisions to the Basic Services mapping standards.
CONTACT INFORMATION
The Design Division of the Bureau of Engineering and Construction is responsible for the design of the public infrastructure of Baltimore County and is divided into the following sections.
Division/Topic | Contact Information |
---|---|
Design Division Design of the public infrastructure of Baltimore County | 111 West Chesapeake Avenue, Room 205 Towson, Maryland 21204 Phone: 410-887-3788 Fax: 410-887-4394 |
Highways Design
| Phone: 410-887-3739 Chief: Nicholas Smith, P.E. |
Design and review of sanitary sewer projects, including:
| Phone: 410-887-3781 Chief: Amy Bley, P.E. |
Design and the review of storm drainage systems for the proper conveyance of storm water from County roads and through County property. | Phone: 410-887-3711 Chief: Sheldon Epstein, P.E. |
Responsible for projects involving structures such as bridges, large culverts and retaining walls to ensure public safety and structural integrity. Project types include:
| Phone: 410-887-3737 Chief: Nicholas Smith, P.E. |
Water Design
| Phone: 410-887-3783 Chief: Erin McKenna-Streyle, P.E. |
| Phone: 410-887-3984 |
| Phone: 410-887-3531 |
| Phone: 410-887-3540 |
Projects under construction | Phone: 410-887-3531 |
Engineering Records | Phone: 410-887-3758 |